West Virginia has 10 wind projects with 367 turbines and 860 MW of capacity, ranking #26 among US states and territories for installed wind. The largest is NedPower Mount Storm, Phase I in Grant County at 164 MW.

Wind projects
10
Turbines
367
Capacity
860 MW
National rank
#26

Map of West Virginia wind projects

Wind project, sized by capacityHover or tap a dot for details.

Top counties for wind

Counties with existing wind farms already have the roads, permits and grid connections that developers look for.

West Virginia counties ranked by wind capacity
CountyCapacityTurbines
Grant County482 MW152
Greenbrier County157 MW87
Barbour County101 MW61
Tucker County66 MW44
Mineral County55 MW23

Thinking about a wind lease in West Virginia?

The most recent project in the database, Black Rock, came online in 2021. If a developer has approached you, compare their offer against what you can learn about your own wind and the projects around you.

Rules on setbacks, decommissioning and how turbines are taxed differ between states and counties. Ask an independent West Virginia attorney who has reviewed wind agreements, and check with your county about local wind ordinances.

All West Virginia wind projects

Wind projects in West Virginia, ranked by capacity
ProjectCountyCapacityTurbinesHub heightOnline
NedPower Mount Storm, Phase IGrant County164 MW178 m2008
Black RockGrant County115 MW23108 m2021
New Creek WindGrant County103 MW4978 m2016
Laurel MountainBarbour County101 MW6180 m2011
Beech RidgeGreenbrier County101 MW6780 m2010
NedPower Mount Storm, Phase IIGrant County100 MW278 m2008
Mountaineer Wind Energy Center (Thomas)Tucker County66 MW4470 m2002
Beech Ridge IIGreenbrier County56 MW2089 m2020
PinnacleMineral County55 MW2380 m2011–2012
Unnamed projectGrant County–77––

Source: U.S. Wind Turbine Database from the U.S. Geological Survey, Lawrence Berkeley National Laboratory and the American Clean Power Association, retrieved 2026-11-19. Includes land-based and offshore turbines that are built or under construction. Projects built in phases are combined; dots show the average location of each project's turbines.