Montana wind farms
Montana has 31 wind projects with 1,031 turbines and 2.1 GW of capacity, ranking #20 among US states and territories for installed wind. The largest is Clearwater Energy Project 1A in Rosebud County at 366 MW.
- Wind projects
- 31
- Turbines
- 1,031
- Capacity
- 2.1 GW
- National rank
- #20
Map of Montana wind projects
Top counties for wind
Counties with existing wind farms already have the roads, permits and grid connections that developers look for.
| County | Capacity | Turbines |
|---|---|---|
| Rosebud County | 568 MW | 205 |
| Stillwater County | 328 MW | 119 |
| Toole County | 296 MW | 197 |
| Carbon County | 240 MW | 114 |
| Custer County | 208 MW | 76 |
| Wheatland County | 166 MW | 128 |
| Judith Basin County | 120 MW | 54 |
| Glacier County | 104 MW | 69 |
| Teton County | 40 MW | 19 |
| Fallon County | 29 MW | 20 |
Thinking about a wind lease in Montana?
The most recent project in the database, Beaver Creek Wind, came online in 2025. If a developer has approached you, compare their offer against what you can learn about your own wind and the projects around you.
Rules on setbacks, decommissioning and how turbines are taxed differ between states and counties. Ask an independent Montana attorney who has reviewed wind agreements, and check with your county about local wind ordinances.
All Montana wind projects
| Project | County | Capacity | Turbines | Hub height | Online |
|---|---|---|---|---|---|
| Clearwater Energy Project 1A | Rosebud County | 366 MW | 131 | 114 m | 2022 |
| Beaver Creek Wind | Stillwater County | 248 MW | 88 | 89 m | 2025 |
| Pryor Mountain | Carbon County | 240 MW | 114 | 80 m | 2021 |
| Clearwater Wind East | Custer County | 208 MW | 74 | 114 m | 2023 |
| Rim Rock | Toole County | 189 MW | 126 | 80 m | 2012 |
| Judith Gap | Wheatland County | 135 MW | 90 | 80 m | 2005 |
| Glacier I | Toole County | 107 MW | 71 | 80 m | 2008 |
| Glacier Wind II | Glacier County | 104 MW | 69 | 80 m | 2009 |
| Clearwater Wind II | Rosebud County | 103 MW | 36 | 111 m | 2023 |
| Clearwater Wind III | Rosebud County | 99 MW | 36 | 111 m | 2024 |
| South Peak | Judith Basin County | 80 MW | 29 | 90 m | 2020 |
| Stillwater Big Sky | Stillwater County | 80 MW | 31 | 84 m | 2018 |
| Spion Kop | Judith Basin County | 40 MW | 25 | 80 m | 2012 |
| Greenfield Wind Farm | Teton County | 30 MW | 13 | 80 m | 2016 |
| Big Timber | Sweet Grass County | 25 MW | 14 | 80 m | 2018 |
Source: U.S. Wind Turbine Database from the U.S. Geological Survey, Lawrence Berkeley National Laboratory and the American Clean Power Association, retrieved 2026-11-19. Includes land-based and offshore turbines that are built or under construction. Projects built in phases are combined; dots show the average location of each project's turbines.