Iowa wind farms
Iowa has 177 wind projects with 6,514 turbines and 13.7 GW of capacity, ranking #3 among US states and territories for installed wind. The largest is Highland I in O'Brien County at 495 MW.
- Wind projects
- 177
- Turbines
- 6,514
- Capacity
- 13.7 GW
- National rank
- #3
Map of Iowa wind projects
Top counties for wind
Counties with existing wind farms already have the roads, permits and grid connections that developers look for.
| County | Capacity | Turbines |
|---|---|---|
| Adair County | 886 MW | 516 |
| O'Brien County | 752 MW | 318 |
| Kossuth County | 642 MW | 220 |
| Sac County | 548 MW | 206 |
| Poweshiek County | 510 MW | 239 |
| Worth County | 507 MW | 304 |
| Ida County | 504 MW | 215 |
| Mitchell County | 503 MW | 241 |
| Franklin County | 500 MW | 262 |
| Cass County | 489 MW | 196 |
Thinking about a wind lease in Iowa?
The most recent project in the database, Prescott Wind Farm II, came online in 2026. If a developer has approached you, compare their offer against what you can learn about your own wind and the projects around you.
Rules on setbacks, decommissioning and how turbines are taxed differ between states and counties. Ask an independent Iowa attorney who has reviewed wind agreements, and check with your county about local wind ordinances.
All Iowa wind projects
| Project | County | Capacity | Turbines | Hub height | Online |
|---|---|---|---|---|---|
| Highland I | O'Brien County | 495 MW | 211 | 80 m | 2015 |
| Rolling Hills | Cass County | 484 MW | 193 | 80 m | 2011 |
| Orient 2019 | Adair County | 399 MW | 190 | 95 m | 2019 |
| Intrepid | Sac County | 320 MW | 107 | 65 m | 2004–2017 |
| Ida Grove | Ida County | 301 MW | 134 | 80 m | 2016 |
| Upland Prairie | Clay County | 299 MW | 121 | 89 m | 2019 |
| Lundgren Repowering | Webster County | 271 MW | 107 | 83 m | 2025 |
| O'Brien | O'Brien County | 250 MW | 104 | 80 m | 2016 |
| Palo Alto | Palo Alto County | 250 MW | 125 | 95 m | 2019 |
| Great Pathfinder Wind | Hamilton County | 224 MW | 62 | 98 m | 2023 |
| Shenandoah Hills Wind | Fremont County | 215 MW | 54 | 107 m | 2025 |
| Glaciers Edge | Cherokee County | 212 MW | 82 | 87 m | 2019 |
| Eclipse | Guthrie County | 207 MW | 87 | 80 m | 2012 |
| Ledyard Windpower | Kossuth County | 207 MW | 46 | 105 m | 2022 |
| Crystal Lake II | Winnebago County | 207 MW | 80 | 80 m | 2008–2009 |
Source: U.S. Wind Turbine Database from the U.S. Geological Survey, Lawrence Berkeley National Laboratory and the American Clean Power Association, retrieved 2026-11-19. Includes land-based and offshore turbines that are built or under construction. Projects built in phases are combined; dots show the average location of each project's turbines.